Filter by
InvestEU operations - list (140)
RSS![Energy](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-12/Sector_Icons_with_colour_-energy.jpg?itok=xDQMiL8C)
Construction and operation of fifteen solar PV plants and their grid connection facilities with a total capacity of c. 736 MWp. The plants are located in the Spanish regions of Castilla y León and Castilla-La Mancha.
- Project locations
- Spain
- Eligible areas
- Energy
![Energy](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-12/Sector_Icons_with_colour_-energy.jpg?itok=xDQMiL8C)
Construction and operation of 5 solar photovoltaic plants with an installed capacity of 252 MWp located in the Spanish regions of Castilla y Leon and Castilla-La Mancha.
- Project locations
- Spain
- Eligible areas
- Energy
![Energy](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-12/Sector_Icons_with_colour_-energy.jpg?itok=xDQMiL8C)
Development, design, construction and operation of 15 solar photovoltaic (PV) plants located across three regions of Spain (Aragon, Castilla La Mancha and Castilla y Leon), with a total installed capacity of approximately 685 MWp.
- Project locations
- Spain
- Eligible areas
- Energy
![Energy](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-12/Sector_Icons_with_colour_-energy.jpg?itok=xDQMiL8C)
The Project consists of financing part of a portfolio of renewable energy (“RE”) plants, for about 2.6 GW, located in Spain and Portugal. Its scope includes also the ancillary infrastructures for the interconnections to the grid.
- Project locations
- Spain, Portugal
- Eligible areas
- Energy
![Mobility](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-11/Sector_Icons_with_colour_-01-15-02%20_Mobility.jpg?itok=ezzutzmd)
The project consists of substituting fossil fuel-powered, polluting and CO2-emitting rental equipment in France. It includes the implementation of charging stations and hydrogen-refuelling stations, as well as the associated digitalisation for tracking, remote diagnostics and preventive maintenance.
- Project locations
- France
- Eligible areas
- Mobility
![Environment](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-11/Sector_Icons_with_colour_-01-03_environment.jpg?itok=I02fTRkW)
The Project concerns the 2021-2023 wastewater investment programme of AB, a private law incorporated entity operating in the regulated sector of Integrated Water Services (“IWS”).
- Project locations
- Italy
- Eligible areas
- Environment
![Energy](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-12/Sector_Icons_with_colour_-energy.jpg?itok=xDQMiL8C)
Unitranche loans to solar PV and wind on-shore projects (SPVs) in Iberia (Spain and Portugal). will increase the renewable energy generation capacity in Spain and Portugal and will contribute to national and EU 2030 climate objectives.
- Project locations
- Spain, Portugal
- Eligible areas
- Energy
![Connectivity](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-11/Sector_Icons_with_colour_-01-07_Connectivity.jpg?itok=DX7dty57)
Design and deployment of a fixed very high capacity network (VHCN) throughout Ireland of the fibre to the home (FTTH) type to provide fibre connectivity to around 320k premises on a step change basis.
- Project locations
- Ireland
- Eligible areas
- Digital connectivity and infrastructure
![Connectivity](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-11/Sector_Icons_with_colour_-01-07_Connectivity.jpg?itok=DX7dty57)
Deployment of a new FTTH (fibre to the home) access network in areas of Poland where very high capacity networks are not available.
- Project locations
- Poland
- Eligible areas
- Digital connectivity and infrastructure
![Society](https://investeu.europa.eu/sites/default/files/styles/oe_theme_ratio_3_2_medium/public/2022-11/Sector_Icons_with_colour_-01-13_Society.jpg?itok=Gyaj-Vxi)
Construction of approximately 640 new social and affordable housing units for rent, of which approximately 232 will be allocated to social housing (36%) and approximately 408 units will be designated as affordable housing (64%).
- Project locations
- Germany
- Eligible areas
- Social investments